Termites inspection has been conducted on March 25, 2019 as scheduled. Twelve residents had reported problem and brought their locker key to the office. Of these (12) lockers only (6) required remediation measures. Repairs will be done promply.

Termites inspection has been conducted on March 25, 2019 as scheduled. Twelve residents had reported problem and brought their locker key to the office. Of these (12) lockers only (6) required remediation measures. Repairs will be done promply.